Projects — chronological

Timeline

As of

03.2026
—
06.2026
Completed

Master's programme — project 2

ARCTA — Automated Radio Communication Transcription & Analysis

An application that turns dialect-heavy fire service and emergency radio traffic into a normalised, standard-German incident log — speech-to-text followed by LLM correction.

→ View details
02.2026
—
present
Ongoing

Project — project lead & requirements engineering

AI Plywood Quality Assistant

Development of a system for automated surface quality inspection — project lead and requirements engineering.

09.2025
—
02.2026
Completed

Master's programme — project 1

Feasibility study on ML-based anomaly detection for industrial furnaces

Feasibility study on machine-learning anomaly detection for industrial pusher-type furnaces — a one-class approach on real process data.

09.2025
Completed

Bachelor's thesis — Smart Engineering programme

Automating quality assurance for rental formwork using artificial intelligence

Collection, preparation and annotation of image data of damaged formwork facing, plus training and evaluation of AI models for defect detection.

03.2025
—
07.2025
Completed

Bachelor study project 4 — continuation of project 2

Proof of concept: quality detection of used plywood

A concept for collecting data to train an AI that automatically checks the quality of used plywood facing.

09.2024
—
02.2025
Completed

Bachelor study project 3

Automation of high-pressure cleaning of element frames: position detection and HMI

Methods for detecting the position of formwork elements in the washing box, requirements for a human-machine interface, and a training video as the output format.

02.2024
—
07.2024
Completed

Bachelor study project 2

Proof of concept: quality detection of used plywood

Detecting and classifying surface defects on used plywood facing with AI and image processing — levels of automation, technology selection and prototypes for data collection.

08.2023
—
02.2024
Completed

Bachelor study project 1

Discrete event simulation of a formwork element processing line

Analysis of a newly installed cleaning line: recording process data, building and evaluating a simulation to enable improvements and more efficient capacity control.

06.2020
—
05.2021
Completed

Diploma thesis — HTBLuVA St. Pölten

Infinity 3D Printer — development of a 3D printer

A belt 3D printer that prints infinitely far in one direction and swaps four extruders fully automatically — for very long prototypes and multi-material parts.